Customization: | Available |
---|---|
Standard: | ANSI, DIN, GB, JIS, En |
Type: | Flange |
Still deciding? Get samples of US$ 100/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description
Flanged Adaptors are designed for pipelines , As a wide tolerance system,it will fit most standard pipe materials and therefore dramatically reducesthe number of dedicated Flanged Adaptors which need to be stocked for maintenance purposes.It is suitable for steel , GRP, PVC, PE, Ductile Iron , Cast Ironand Asbestors Cement. When connecting PE pipes , It is important that pipe inserts are fitted to the PE pipes .
Material Specification
Bolts&Nuts | Electroplated galvanized zinc. Hot DIP Galvanized of Stainless Steel |
BS729:1971,ISO1461 |
Sleeve | Ductile Iron | BS2789:1985 Grade420/12 |
Gland | Ductile Iron | BS2789:1985 Grade420/12 |
Rubber Gasket | SBR ,EPDM or other | BS 2494:1990 Type W |
Coating | Fusion Bonded Epoxy Or Wet Paint |
Minimum 150 μm thick |
Dimension in mm
DN | L | D | OD | Type of Pipes | Flange Infor. | ||
PN10/16 | BS10/E | ANSI/150 | |||||
50 | 107 | 185 | 59-72 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
65 | 106 | 185 | 72-85 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
80 | 107 | 204 | 88-103 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
100 | 108 | 226 | 108-128 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
125 | 115 | 250 | 132-158 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
150 | 110 | 288 | 158-182 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
175 | 113 | 288 | 189-212 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
200 | 110 | 342 | 218-235 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
250A | 128 | 400 | 244-276 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
250B | 128 | 406 | 271-289 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
300A | 128 | 478 | 315-332 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
300B | 128 | 478 | 322-350 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
400 | 138 | 580 | 425-442 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
500 | 138 | 715 | 527-544 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
600 | 140 | 840 | 630-647 | UPVC;DI;CI;AC;STEEL | √ | √ | √ |
Packaging & Shipping
1.Inspection:Foundry in-house; Third Party inspection available upon request .
2.Packing: Wooden pallet ; Cases ; As customer ruqirement .
3.Delivery Date:40 days ; According to the quantity .
4.Payment: 30% by T/T in advance, the balance before Shipping . D/P ,L/C .